Site Evaluation
Soil borings, slope and topography assessment, setback measurements, and any limiting-layer identification.
Texas OSSF permitting is not a process you want to manage yourself. We run the soil and site evaluation, produce code-compliant CAD drawings, file the permit with your county, and follow it through approval. You stay focused on your project, not the county office.
In Texas, every new or modified OSSF (On-Site Sewage Facility) requires a permitted design signed off by a TCEQ-licensed site evaluator. The permit does not come before the design. The design cannot be right without an accurate soil and site evaluation. The three steps are a chain, and the chain is only as strong as the evaluator who ran it.
We are licensed to perform the full chain: soil and site evaluation, system design, and OSSF permit filing. That matters because it removes the handoff between the evaluator and the designer. When the same licensed professional evaluates the soil and produces the design, the data does not get lost or misread between parties, and the county has fewer grounds to kick the application back.
Travis County, Hays County, Bastrop County, and the other counties we work in each have their own OSSF programs with their own forms and review timelines. We know their requirements and file applications that are correct the first time. Delays most often come from incomplete or non-compliant submittals, not from county processing time. We do not submit incomplete applications.
We offer design and permitting as a standalone service for property owners or builders who already have an installation contractor. If you want us to handle the installation as well, that is our preferred arrangement, because it removes the handoff and one more point where errors can enter. See our new installation page for the full picture.
Soil borings, slope and topography assessment, setback measurements, and any limiting-layer identification.
Code-compliant design matched to your soil data, lot, bedroom count, and applicable county OSSF rules. CAD drawings produced and reviewed.
Complete OSSF application submitted to your county. We respond to any reviewer questions and track the application to approval.
Permit approved and issued. Documents delivered to you. If we are also installing, we schedule the installation from here.
Tell us about your property and what you’re building. We’ll schedule the site evaluation and walk you through the permit timeline for your county.